For the seventh annual Damascus Hard Core on Sunday, May 20, and Monday, May 21, the hikers and club members exceeded expectations. One hundred and twenty people, including 26 club members and 94 hikers, volunteered 1781 hours to make this traditional event very successful. On Sunday, 88 enthusiastic hikers and 24 club members worked. On Monday there were 77 hikers and 16 club members. Continue reading “Hard Core – Cherry Gap Relocation (2007)”
Hard Core – Mountaineer Falls Shelter Construction (2006)
Everyone participating in the sixth annual Damascus Hard Core on Sunday, May 21, and Monday, May 22, exceeded expectations again. The first expectation exceeded was the number of hikers that showed up. Would you believe 143 hikers gave their time to help this year? In addition, 28 TEHCC members and affiliates also helped to pull off this major event. These 171 people donated 2209 hours of volunteer time to the Appalachian Trail. A major portion of work was on and around the new shelter about 1.5 miles south of Walnut Mountain Road. A secondary project was trail relocations near Low Gap on Unaka Mountain. Continue reading “Hard Core – Mountaineer Falls Shelter Construction (2006)”
Hard Core – Bitter End to Dennis Cove Relocations (2005)
Are you willing to get out of your tent in the morning, drive a couple of hours, grab some digging tools, hike 1.5 miles, and then start digging trail? More importantly, are you willing to do all that in the pouring rain? That is exactly what about 74 hikers did on Sunday, May 15, 2005 as they left Damascus Trail Days and ventured to help TEHCC relocate steep and eroding trail just north of Bitter End. Nine Club members and affiliates joined the hikers, only we were lucky enough to rise from bed, rather than a sleeping bag. Fortunately, by early afternoon the rains tapered off and there was only an occasional light mist. Continue reading “Hard Core – Bitter End to Dennis Cove Relocations (2005)”
Hard Core – Bitter End to Dennis Cove Relocations (2004)
The 4th annual Damascus Hard-Core work trip was another great event. The two days of work involved 99 individuals and almost 1600 hours. Eighteen were TEHCC members or program affiliates. The remaining 81 were enthusiastic volunteer hikers. They came for work and work they did! There were many rhododendrons and short terrain dips that contained about three feet of duff. Over 2000 feet of sidehill trail was built as a relocation to remove a steep and eroding section. Continue reading “Hard Core – Bitter End to Dennis Cove Relocations (2004)”
Hard Core – Bitter End to Dennis Cove Relocations (2003)
In spite of the rainy weather predictions, we had fair weather and a great 3rd annual Damascus Hard-Core work trip. The two days of work involved 71 individuals for over 1,000 hours. Seventeen were TEHCC members or program affiliates. The remaining 54 were enthusiastic volunteer hikers. They came for work and work they did! There were many rhododendrons and short terrain dips that contained over two feet of duff. Duff became a new addition to the hiker vocabulary. They even created Mr. Duff using duff as the head, soda cans as eyes and a rain jacket and pants for the body. Continue reading “Hard Core – Bitter End to Dennis Cove Relocations (2003)”
Hard Core – Clyde Smith Shelter Remodel and Elk River Relocation (2002)
Wow! The 2nd annual Damascus Trail Days Hard-Core was a great success! Continue reading “Hard Core – Clyde Smith Shelter Remodel and Elk River Relocation (2002)”
Round Bald Relocation / Stairway to Heaven (2000-2001)
During 2000-2001, the A.T. on Round Bald was relocated and rehabilitated, to eliminate significant erosion problems and replace the former steep route with a more gradual sidehill trail. The project has three distinct phases:
- Phase 1 – Gravel delivery and trail construction from Carvers Gap to a large rock about two-thirds of the way up to the summit of Round Bald – summer of 2000.
- Phase 2 – Gravel delivery between the large rock and Engine Gap – February-March 2001.
- Phase 3 – Spreading the gravel on the existing Trail route between the large rock and Engine Gap – summer of 2001.
Continue reading “Round Bald Relocation / Stairway to Heaven (2000-2001)”
Hard Core – Round Bald Improvements (2001)
Come let me tell you a story about a man named Forest Phil… Continue reading “Hard Core – Round Bald Improvements (2001)”
Carvers Gap to Cloudland Waterbar Installation (1999)
In November 1999, the Tennessee Eastman Hiking and Canoeing Club conducted three large Appalachian Trail-maintenance projects with regional volunteers from local colleges and the Boy Scouts. Continue reading “Carvers Gap to Cloudland Waterbar Installation (1999)”