Editing Shelter:Roan High Knob
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 34: | Line 34: | ||
*2003: Installed cedar shingles on front and rear eaves, added cooking table against outside front wall, built railing upstairs around ladder opening, and coated outside with clear stain. | *2003: Installed cedar shingles on front and rear eaves, added cooking table against outside front wall, built railing upstairs around ladder opening, and coated outside with clear stain. | ||
*Oct 2003: Patched the roof and fixing the porch overhang (jacking up and placing supporting rocks to avoid rot). The shelter support was previously non-existing, thus this action kept it from settling down the mountainside. | *Oct 2003: Patched the roof and fixing the porch overhang (jacking up and placing supporting rocks to avoid rot). The shelter support was previously non-existing, thus this action kept it from settling down the mountainside. | ||
*Dec 1996: Floor repaired by TEHCC of installing new plywood sheets. | *Dec 1996: Floor repaired by TEHCC of installing new plywood sheets. | ||
*July 1980: Renovated to be an AT shelter by the Cherokee National Forest. | *July 1980: Renovated to be an AT shelter by the Cherokee National Forest. |