*Apr 2007: Complete replacement the sleeping platform (thanks to grant from L.L. Bean). Also repaired water source by installing new pipe and cleaning out the pools. | *Apr 2007: Complete replacement the sleeping platform (thanks to grant from L.L. Bean). Also repaired water source by installing new pipe and cleaning out the pools. | ||
*May 2003: Roof leak fixed. | *May 2003: Roof leak fixed. | ||
*Sep 1999: Installed padding on both ends of gutter. | |||
*Nov 1992: New metal roof installed (thanks to Forest Service funding). Painted shelter inside and out. Carried donated picnic table to shelter. | *Nov 1992: New metal roof installed (thanks to Forest Service funding). Painted shelter inside and out. Carried donated picnic table to shelter. | ||
*1989: Roof repaired. | *1989: Roof repaired. |