Editing Erwin Linear Trail
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 52: | Line 52: | ||
== Route Description== | == Route Description== | ||
<!-- Detailed description of the route. Is there any side trails that are worth traveling? --> | <!-- Detailed description of the route. Is there any side trails that are worth traveling? --> | ||
Four miles of a asphalt path paralleling I-26 between Industrial Drive to Old Fishery Road | Four miles of a asphalt path paralleling I-26 between Industrial Drive to Old Fishery Road. | ||
While trail signs indicate connection/parking at the north end with Erwin city park, the section under Harris Hollow Road was never built beyond a "bridge to nowhere" on the north side. Old Fishery Road is the north terminus. Likewise, the trail sign shows the southern end at the gravel parking are on Industrial Drive, but it was extended just under Jackson Love Hwy, thus allowing access to its bike path. | While trail signs indicate connection/parking at the north end with Erwin city park, the section under Harris Hollow Road was never built beyond a "bridge to nowhere" on the north side. Old Fishery Road is the north terminus. Likewise, the trail sign shows the southern end at the gravel parking are on Industrial Drive, but it was extended just under Jackson Love Hwy, thus allowing access to its bike path. |