South Holston Dam: Difference between revisions

From TEHCC Wiki
Jump to navigation Jump to search
(Hike time, distance, and difficulty)
Line 49: Line 49:
== Misc. Information ==
== Misc. Information ==
<!-- Enter any additional information that doesn't fit an any other fields. Any seasonal features, factoids, etc...? -->
<!-- Enter any additional information that doesn't fit an any other fields. Any seasonal features, factoids, etc...? -->
The reservoir is created by a TVA dam on the South Fork Holston River. Construction of the dam was started in 1942, but halted due to WWII, and finally completed in 1950.
The reservoir is created by a TVA dam on the South Fork Holston River. Construction of the dam was started in 1942, but halted due to WWII, and finally completed in 1950. The earth-and-rock fill dam is 285 feet high and 1,600 feet long.
 


== Maps ==
== Maps ==

Revision as of 05:50, 30 July 2011


File:Placeholder.gif
Trail Name South Holston Dam
Nearest City *
State Tennessee
Trail Marking {{{Marking}}}
Trail Use/Features Dnr hiking.png
Difficulty Rating Easy
Hiking Time 2.52.5 Hours <br />0.156 Days <br />150 Min <br />
Distance, round-trip 55 mi <br />8.047 km <br />
Climb/Descent Elevation *"*" is not a number. / {{{Elevation Loss}}}"{{{Elevation Loss}}}" is not a number.
High Point *"*" is not a number.
Nearest Medical *, TN
Trip Reports Click Here
Loading map...
[http://maps.google.com/maps?q=
  • ,* Show Large Map]


Trail Overview

A short (about 5 miles) stroll along nearly level path from the South Holston Lake dam, by the lake shore, and ending at the spillway.

How to get there

Route Description

Typical Conditions

Fees, Permits, etc.

After the Hike

Misc. Information

The reservoir is created by a TVA dam on the South Fork Holston River. Construction of the dam was started in 1942, but halted due to WWII, and finally completed in 1950. The earth-and-rock fill dam is 285 feet high and 1,600 feet long.

Maps

Photos