Laurel Creek Trail: Difference between revisions
m (→Maps: Fixed kml link and changed pin locations) |
m (Text replacement - "http://tehcc.org/clubwiki/" to "https://tehcc.org/clubwiki/") |
||
(One intermediate revision by one other user not shown) | |||
Line 61: | Line 61: | ||
== Maps == | == Maps == | ||
<!-- You can place pictures, PDF's, links, or even create a Google map with your waypoints and place it here. --> | <!-- You can place pictures, PDF's, links, or even create a Google map with your waypoints and place it here. --> | ||
<display_map center=" | <display_map center="36.6,-81.7535" type="terrain" width="auto" height="auto" gkml="https://tehcc.org/clubwiki/kml/Laurel_Creek_Trail.kml"> | ||
36.593750, -81.754750~Southern Terminus~~MarkerT.png | |||
36.613667, -81.757167~Northern Terminus~~MarkerT.png | |||
</display_map> | </display_map> | ||
Latest revision as of 11:12, 7 January 2023
|
Trail Overview[edit]
Short rails-to-trails conversion along Laurel Creek/Highway TN91.
How to get there[edit]
From Kingsport, TN:
- Take I-81 north to Exit 19 for US-58 towards Damascus.
- Continue through Damascus.
- Take right (south) when VA-91 and US-58 split.
- Proceed back into Tennessee to Laurel Bloomery.
- Roughly 1.3 miles inside Tennessee, the formal parking lot will be on right.
From Mountain City, TN:
- Proceed north on TN 91 for 9.4 miles to Laurel Bloomery.
- The formal parking lot will be on your left.
Route Description[edit]
Currently a double in-and-out as the parking lot is within the converted rails-to-trail section. Specific distances need to be measured for this wiki.
Nearby is one of the blue-blazed access points for the Iron Mountain Trail, but a VERY steep climb.
Typical Conditions[edit]
Trail is a gravel path of the former railroad grade.
Fees, Permits, etc.[edit]
Located in Watauga Ranger District of Cherokee National Forest. Office number is (423) 735-1500. No fee to hike the trail, but state fishing regulations apply to Laurel Creek.
After the Hike[edit]
Stop in Damascus for ice cream.
Misc. Information[edit]
This trail conversion opened in Fall 2014. Long-term plans are to connect in Damascus with the other bike trail systems.