Editing Shelter:Clyde Smith
Jump to navigation
Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 32: | Line 32: | ||
*2012: Caulked all roof screws. | *2012: Caulked all roof screws. | ||
*May 2009: Eagle project improved the spring water source. [http://tehcc.org/pdf/newsletters/news200910.pdf TEHCC newsletter article] | *May 2009: Eagle project improved the spring water source. [http://tehcc.org/pdf/newsletters/news200910.pdf TEHCC newsletter article] | ||
*Renamed from Roan Highlands Shelter to Clyde Smith Shelter. | |||
*May 2002: Remodeled from floor up during Hard Core event. Porch with eating area and upper level bunks were added. | *May 2002: Remodeled from floor up during Hard Core event. Porch with eating area and upper level bunks were added. | ||
*Nov 1993: Roof extended by 2 ft and sides added to reduce the probability of rain blowing into the shelter. | *Nov 1993: Roof extended by 2 ft and sides added to reduce the probability of rain blowing into the shelter. |