Round Bald Relocation / Stairway to Heaven (2000-2001)

During 2000-2001, the A.T. on Round Bald was relocated and rehabilitated, to eliminate significant erosion problems and replace the former steep route with a more gradual sidehill trail. The project has three distinct phases:

  • Phase 1 – Gravel delivery and trail construction from Carvers Gap to a large rock about two-thirds of the way up to the summit of Round Bald – summer of 2000.
  • Phase 2 – Gravel delivery between the large rock and Engine Gap – February-March 2001.
  • Phase 3 – Spreading the gravel on the existing Trail route between the large rock and Engine Gap – summer of 2001.

Continue reading “Round Bald Relocation / Stairway to Heaven (2000-2001)”